2 Post Feedthru Kit

The 2 post feedthru supplies an insulated part so wiring can transition from inside an electronics bay to the outside for connection to igniters, electric matches, or other electronics.
Manufacturer: SMT Designs
SKU: DF2P-00104
Shipping date: 2 - 14 business days depending on order size
$2.45

The 2 post feedthru kit supplies an insulated part so wiring can transition from inside an electronics bay to the outside for connection to igniters, electric matches, or other elctronics.  The feedthru can be mounted by following the drill template in the General Outlines file below and only requires a 3/8" drill bit and a 1/8" drill bit.

The feedthru mounts with 4-40 hardware (not included).

Contents

  • 2 Post Feedthru
  • two 1/2" long 6-32 hex spacers
  • two 1" 6-32 machine screws
  • two 1/4" 6-32 machine screws
  • two #6 flat washers
  • four #6 internal lock washers
  • two #6 18-22 AWG crimp terminals
  • one 1" long by 1/8" heat shrink tubing

Specifications

  • Length 38.2mm
  • Depth 23mm"
  • Height (total) 17mm (post) 13mm (assembled) 36mm
  • Weight (assembled) 17g

Feedthru Kit Assembly Instructions

Drill Template for feedthru mounting

Customers who bought this item also bought

4 Post Feedthru Kit

DF4P-00105
The 4 post feedthru supplies an insulated connection from the internal electronics bay to the outside for igniters, electric matches, or other electronics.
$3.45

Bay 9 Volt Battery Holder Kit

BH9V-00112
The bay battery holder secures a 9 volt battery on a traditional electronics bay sled and allows for the battery leads to be positioned in any of the four corners of the holder.
$2.95

Bay Switch Kit

SWBY- 00109
The bay switch was designed to be part of a traditional electronic bay to arm and disarm altimeters using an arming screw through the outside wall of a rocket.
$2.95

Tie Wrap Loops Kit

TWL-00162
The tie wrap loops are used in traditional electronic bays to organize and support wiring on your sled.
$2.45